Well, something else that is different in France. When I did my C I had 7 tons (IIRC) of concrete blocks in the back, and when I did my C+E I had 17 tons of concrete block in the back.
Well, something else that is different in France. When I did my C I had 7 tons (IIRC) of concrete blocks in the back, and when I did my C+E I had 17 tons of concrete block in the back.